A RAMS document combines a risk assessment (what could go wrong, how likely, how severe, what controls reduce it) with a method statement (the safe step-by-step way to do the job). It is expected for higher-risk cleaning tasks — working at height, using powered equipment, handling biohazards, or using stronger chemicals — and often requested by clients before work starts.
Download the template
Download the PDFA fillable RAMS form with the risk-assessment matrix and method-statement structure below.
Risk assessment fields
| Field | What to record |
|---|---|
| Task | e.g. high-level window cleaning, floor stripping, biohazard clean-up |
| Hazards identified | e.g. fall from height, slips, chemical exposure, manual handling |
| Who might be harmed | Operative, other staff, public, site visitors |
| Likelihood (1-5) | Rate before controls applied |
| Severity (1-5) | Rate before controls applied |
| Risk rating | Likelihood x severity |
| Control measures | e.g. correct access equipment, PPE, COSHH controls, signage/barriers |
| Residual risk rating | Rate again after controls applied |
Method statement structure
- Scope of works and location
- Personnel involved and their competence/training
- Equipment and materials required, including PPE
- Step-by-step sequence of the work, in the order it will be carried out
- Specific controls at each step (e.g. barrier off the area before floor stripping; two-person lift for heavy equipment)
- Emergency arrangements (who to contact, nearest first-aider, spillage procedure)
- Sign-off: prepared by, reviewed by, date, and site induction record
When a RAMS is expected
- Working at height (window cleaning above ground level, high-level dusting with access equipment)
- Use of powered cleaning equipment (floor scrubbers, pressure washers)
- Biohazard, trauma or contamination cleaning
- Use of stronger or restricted chemicals (floor strippers, some disinfectants)
- Any task a client's own site rules specifically require a RAMS for before access is granted
Keeping RAMS current
Review and reissue a RAMS whenever the task, site, equipment or chemicals change — a RAMS written for one building is not automatically valid for another with different access, layout or risks.